Minor Irrigation · Kerala

Dugwell for Alluvial formations Subsidy in Kerala

Dugwell for Alluvial formations

NABARD Unit Cost for Dugwell for Alluvial formations in Kerala

Government-approved benchmark amount for minor irrigation financing

NABARD Unit Cost₹66,500
StateKerala
CategoryMinor Irrigation
Sub-CategoryDugwell
SpecificationDiameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%

Dugwell for Alluvial formations — Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%

Eligibility for Dugwell for Alluvial formations Subsidy in Kerala

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Kerala
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Dugwell for Alluvial formations Subsidy in Kerala

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹66,500 as the benchmark for a Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300% investment.
  2. Visit your bank in Kerala — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM or PMKSY.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Dugwell for Alluvial formations Subsidy — State-wise Comparison

NABARD unit costs for Dugwell for Alluvial formations across 2 states. Amounts reflect local input costs and state-level additions.

Dugwell for Alluvial formations NABARD unit cost across Indian states
StateSubsidy AmountDetails
Keralacurrent₹66,500View →
Keralacurrent₹48,500View →

More Minor Irrigation Subsidies in Kerala

View all Minor Irrigation activities in Kerala →

More Subsidy Categories in Kerala

Frequently Asked Questions

What is the NABARD subsidy amount for Dugwell for Alluvial formations in Kerala?

The NABARD unit cost for Dugwell for Alluvial formations in Kerala is ₹66,500 (specification: Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%" mean for Dugwell for Alluvial formations?

The specification "Diameter 2.0 m, Depth 6m RCC rings holdings upto 0.40 Ha, Cropping Intensity 275 to 300%" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Dugwell for Alluvial formations subsidy in Kerala?

Step 1: Prepare a DPR for Dugwell for Alluvial formations using the NABARD unit cost of ₹66,500 as the benchmark. Step 2: Visit a nationalised bank or RRB in Kerala with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Minor Irrigation department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Dugwell for Alluvial formations in Kerala?

Dugwell for Alluvial formations falls under the Minor Irrigation category. Relevant central schemes include PM-KUSUM (solar pumps) and PMKSY (irrigation). Check the Apply section below for the specific portal and nodal department in Kerala.

Which state gives the highest subsidy for Dugwell for Alluvial formations?

Kerala offers ₹66,500 for Dugwell for Alluvial formations, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Dugwell for Alluvial formations financing in Kerala?

NABARD-linked term loans for minor irrigation investments like Dugwell for Alluvial formations typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.