Renewable Energy · Rajasthan

Additional Cost Subsidy in Rajasthan

Additional Cost

NABARD Unit Cost for Additional Cost in Rajasthan

Government-approved benchmark amount for renewable energy financing

NABARD Unit Cost₹20,000
StateRajasthan
CategoryRenewable Energy
Sub-CategorySolar Pumpsets
SpecificationManual Tarcker 4400 WP 5 HP

Additional Cost — Manual Tarcker 4400 WP 5 HP

Eligibility for Additional Cost Subsidy in Rajasthan

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Rajasthan
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: Manual Tarcker 4400 WP 5 HP. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Additional Cost Subsidy in Rajasthan

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹20,000 as the benchmark for a Manual Tarcker 4400 WP 5 HP investment.
  2. Visit your bank in Rajasthan — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Additional Cost Subsidy — State-wise Comparison

NABARD unit costs for Additional Cost across 5 states. Amounts reflect local input costs and state-level additions.

Additional Cost NABARD unit cost across Indian states
StateSubsidy AmountDetails
Rajasthancurrent₹5,20,000View →
Rajasthancurrent₹20,000View →
Rajasthancurrent₹20,000View →
Rajasthancurrent₹5,000View →
Rajasthancurrent₹5,000View →

More Renewable Energy Subsidies in Rajasthan

View all Renewable Energy activities in Rajasthan →

More Subsidy Categories in Rajasthan

Frequently Asked Questions

What is the NABARD subsidy amount for Additional Cost in Rajasthan?

The NABARD unit cost for Additional Cost in Rajasthan is ₹20,000 (specification: Manual Tarcker 4400 WP 5 HP). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "Manual Tarcker 4400 WP 5 HP" mean for Additional Cost?

The specification "Manual Tarcker 4400 WP 5 HP" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Additional Cost subsidy in Rajasthan?

Step 1: Prepare a DPR for Additional Cost using the NABARD unit cost of ₹20,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Rajasthan with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Additional Cost in Rajasthan?

Additional Cost falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Rajasthan.

Which state gives the highest subsidy for Additional Cost?

Rajasthan offers ₹20,000 for Additional Cost, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Additional Cost financing in Rajasthan?

NABARD-linked term loans for renewable energy investments like Additional Cost typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.