Renewable Energy · Rajasthan
Wind Energy Subsidy in Rajasthan
Wind Energy
NABARD Unit Cost for Wind Energy in Rajasthan
Government-approved benchmark amount for renewable energy financing
Wind Energy — Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months
Eligibility for Wind Energy Subsidy in Rajasthan
Who can apply
- Individual farmers with land records (7/12, patta, or registered lease deed) in Rajasthan
- Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
- Agri-entrepreneurs and cooperatives for commercial-scale investments
- SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)
Specification note
This unit cost applies specifically to: Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.
How to Apply for Wind Energy Subsidy in Rajasthan
Step-by-step process
- Prepare a Detailed Project Report — Use the NABARD unit cost of ₹3,91,62,000 as the benchmark for a Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months investment.
- Visit your bank in Rajasthan — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
- Scheme linkage — The bank will link your application to PM KUSUM.
- Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
- Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.
Relevant central schemes:
Wind Energy Subsidy — State-wise Comparison
NABARD unit costs for Wind Energy across 2 states. Amounts reflect local input costs and state-level additions.
More Renewable Energy Subsidies in Rajasthan
- Samll Hydro Power Plants₹38,95,00,000
- Biomass Power Plants₹1,11,85,07,500
- Biomass Power Plants₹90,06,60,000
- Biomass Power Plants₹91,62,00,000
- Biomass Power Plants₹97,83,00,000
- On grid Solar Photovoltaic Power Plant₹25,00,00,000
- On grid Solar Photovoltaic Power Plant₹50,00,00,000
- SPV Surface Pump₹3,84,000
More Subsidy Categories in Rajasthan
Agri Finance & Credit
Loans, crop insurance and investment norms — NABARD unit costs, PMFBY rates and KCC interest.
Weather & Crop Advisories
District-level agromet advisories combining IMD 5-day weather forecasts with crop-specific pest, disease and irrigation recommendations.
Agriculture News
Daily updates on mandi price movements, scheme announcements, weather advisories and crop-wise reports from state agriculture departments.
Agri Input Dealers
Find licensed seed, fertilizer and pesticide dealers near you.
Frequently Asked Questions
What is the NABARD subsidy amount for Wind Energy in Rajasthan?
The NABARD unit cost for Wind Energy in Rajasthan is ₹3,91,62,000 (specification: Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.
What does "Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months" mean for Wind Energy?
The specification "Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.
How do I apply for the Wind Energy subsidy in Rajasthan?
Step 1: Prepare a DPR for Wind Energy using the NABARD unit cost of ₹3,91,62,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Rajasthan with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.
Which government scheme covers Wind Energy in Rajasthan?
Wind Energy falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Rajasthan.
Which state gives the highest subsidy for Wind Energy?
Among states with published NABARD unit costs for Wind Energy, Karnataka offers the highest amount at ₹4,50,00,000, compared to ₹3,91,62,000 in Rajasthan. Differences reflect local input costs, transport, and state-level top-up subsidies. The compare table below shows amounts across all states where this activity has published unit costs.
What is the loan repayment period for Wind Energy financing in Rajasthan?
NABARD-linked term loans for renewable energy investments like Wind Energy typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.