NABARD Unit Costs · Rajasthan
Renewable Energy Subsidy in Rajasthan
20 activities listed with government-approved unit costs — up to ₹1,11,85,07,500. Compare subsidies, eligibility, and how to apply.
NABARD Unit Costs for Renewable Energy in Rajasthan
Filter by sub-category or browse all 20 activities below
| Item / Scheme | Sub-Category | Specification | Subsidy Amount |
|---|---|---|---|
| Wind EnergyWind Energy | Renewable EnergyRenewable Energy | Power plant 0.6 Mw 13 Lakh units/ annum Fixed Capaitla nad Woking Capital for 3 months | ₹₹3,91,62,000 |
| Samll Hydro Power PlantsSamll Hydro Power Plants | Renewable EnergyRenewable Energy | 5 Mw @ Rs.7.79 Cr/Mw | ₹₹38,95,00,000 |
| Biomass Power PlantsBiomass Power Plants | Renewable EnergyRenewable Energy | 5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw | ₹₹27,95,15,000 – ₹₹1,95,75,00,000 |
| Biomass Power PlantsBiomass Power Plants | Renewable EnergyRenewable Energy | 5Mw to 25 Mw Air cooled other than paddy straw and P.juliflora @Rs.6.0044 Cr/ Mw | ₹₹30,02,20,000 – ₹₹1,50,11,00,000 |
| Biomass Power PlantsBiomass Power Plants | Renewable EnergyRenewable Energy | 5Mw to 25 Mw Water cooled with paddy straw and P.juliflora @Rs.6.108Cr/ Mw | ₹₹30,54,00,000 – ₹₹1,52,70,00,000 |
| Biomass Power PlantsBiomass Power Plants | Renewable EnergyRenewable Energy | 5Mw to 25 Mw Air cooled with paddy straw and P.juliflora @Rs.6.522Cr/ Mw | ₹₹32,61,00,000 – ₹₹1,63,05,00,000 |
| On grid Solar Photovoltaic Power PlantOn grid Solar Photovoltaic Power Plant | Renewable EnergyRenewable Energy | 5 Mw Civil works. Machinery devoid of transmission lines | ₹₹25,00,00,000 |
| On grid Solar Photovoltaic Power PlantOn grid Solar Photovoltaic Power Plant | Renewable EnergyRenewable Energy | 10 Mw Civil works. Machinery devoid of transmission lines | ₹₹50,00,00,000 |
| SPV Surface PumpSPV Surface Pump | Solar PumpsetsSolar Pumpsets | DC 20 Head 2200WP 3 HP | ₹₹3,84,000 |
| SPV Surface PumpSPV Surface Pump | Solar PumpsetsSolar Pumpsets | DC 20 Head 4400WP 5 HP | ₹₹4,50,000 |
| SPV Surface PumpSPV Surface Pump | Solar PumpsetsSolar Pumpsets | AC 20 Head 2200WP 3 HP | ₹₹3,30,000 |
| SPV Submersible PumpSPV Submersible Pump | Solar PumpsetsSolar Pumpsets | AC 20 Head 4400WP 5 HP | ₹₹4,97,000 |
| SPV Submersible PumpSPV Submersible Pump | Solar PumpsetsSolar Pumpsets | DC 20 Head 2200WP 3 HP | ₹₹4,15,000 |
| SPV Submersible PumpSPV Submersible Pump | Solar PumpsetsSolar Pumpsets | DC 20 Head 4400WP 5 HP | ₹₹4,85,000 |
| SPV Submersible PumpSPV Submersible Pump | Solar PumpsetsSolar Pumpsets | AC 20 Head 2200WP 3 HP | ₹₹3,65,000 |
| Additional CostAdditional Cost | Solar PumpsetsSolar Pumpsets | AC 20 Head 4400WP 5 HP | ₹₹5,20,000 |
| Additional CostAdditional Cost | Solar PumpsetsSolar Pumpsets | Manual Tarcker 2200 WP 3 HP | ₹₹5,000 |
| Additional CostAdditional Cost | Solar PumpsetsSolar Pumpsets | Manual Tarcker 4400 WP 5 HP | ₹₹5,000 |
| Additional CostAdditional Cost | Solar PumpsetsSolar Pumpsets | Auto Tarcker 2200 WP 3 HP | ₹₹20,000 |
| Additional CostAdditional Cost | Solar PumpsetsSolar Pumpsets | Manual Tarcker 4400 WP 5 HP | ₹₹20,000 |
How to Apply for Renewable Energy Subsidy in Rajasthan
Step-by-step process for first-time applicants
- Prepare a Detailed Project Report (DPR) — Use the NABARD unit costs listed in the table below as benchmarks for your renewable energy investment estimate.
- Approach your bank in Rajasthan — Visit a nationalised bank, Regional Rural Bank (RRB), or PACS branch with your Aadhaar, land records (7/12 or patta), and the DPR.
- Scheme selection — The bank will match your activity to the applicable central or state scheme — for renewable energy, this is typically PM-KUSUM.
- Departmental approval and verification — The bank routes the subsidy claim to the relevant department for technical appraisal and sanction.
- Subsidy disbursement — After physical verification of the installed asset, the capital subsidy is credited directly into your loan account, reducing the outstanding principal.
Documents required for renewable energy subsidy in Rajasthan
- Aadhaar card and PAN card
- Land ownership documents (7/12, patta, or lease deed)
- Bank passbook copy
- Caste certificate (if applying under SC/ST quota)
- Detailed Project Report (DPR) as per NABARD unit costs
- Vendor quotations for equipment or construction materials
Relevant central schemes for renewable energy:
Other Subsidy Categories in Rajasthan
Agri Finance & Credit
Loans, crop insurance and investment norms — NABARD unit costs, PMFBY rates and KCC interest.
Weather & Crop Advisories
District-level agromet advisories combining IMD 5-day weather forecasts with crop-specific pest, disease and irrigation recommendations.
Agriculture News
Daily updates on mandi price movements, scheme announcements, weather advisories and crop-wise reports from state agriculture departments.
Agri Input Dealers
Find licensed seed, fertilizer and pesticide dealers near you.
Frequently Asked Questions
What is the NABARD subsidy amount for renewable energy in Rajasthan?
NABARD has published unit costs for 20 renewable energy activities in Rajasthan. The highest subsidy is for Biomass Power Plants at ₹1,11,85,07,500. Amounts vary by the specific activity, scale, and specification — browse the table below for exact figures for each activity.
Who is eligible for renewable energy subsidy in Rajasthan?
Individual farmers, farmer groups, agri-entrepreneurs, and FPOs with valid land records or a lease agreement are eligible for renewable energy subsidies in Rajasthan. For activities above a certain investment threshold, a detailed project report (DPR) approved by the relevant department is required before the bank disburses the loan.
How do I apply for a renewable energy loan in Rajasthan?
Step 1: Prepare a DPR estimating the investment based on NABARD unit costs. Step 2: Approach a nationalised bank or RRB in Rajasthan with your Aadhaar, land records, and DPR. Step 3: The bank appraises the project and applies for subsidy through the relevant state department. Step 4: On approval, the loan is disbursed and the subsidy is credited to the loan account, reducing your outstanding balance.
Which bank offers the best renewable energy term loan in Rajasthan?
Nationalised banks (SBI, Bank of Baroda, Canara Bank), Regional Rural Banks, and NABARD-refinanced cooperative banks all offer renewable energy term loans in Rajasthan. Interest rates on NABARD-refinanced loans are typically 7–9% p.a., with effective rates lower after government interest subvention. Compare the bank's processing fee and collateral requirements before applying.
What documents are needed for a renewable energy subsidy in Rajasthan?
Core documents for any renewable energy subsidy in Rajasthan: (1) Aadhaar card and PAN card, (2) land ownership documents (7/12, patta, or lease deed), (3) bank passbook copy, (4) caste certificate if applying under SC/ST quota, (5) Detailed Project Report (DPR) as per NABARD unit costs, (6) quotations from vendors for equipment or materials. Additional documents may be needed for specific activities.
Is the renewable energy subsidy in Rajasthan a capital subsidy or an interest subsidy?
Most NABARD-linked renewable energy subsidies in Rajasthan are capital (back-end) subsidies — the government deposits a fixed amount (25–50% of project cost) directly into your loan account after the investment is verified. This reduces the outstanding principal. Some schemes additionally offer interest subvention (reducing the effective interest rate), but the primary benefit is the capital subsidy component.