Renewable Energy · Rajasthan

Biomass Power Plants Subsidy in Rajasthan

Biomass Power Plants

NABARD Unit Cost for Biomass Power Plants in Rajasthan

Government-approved benchmark amount for renewable energy financing

Subsidy Range₹27,95,15,000 – ₹1,95,75,00,000
StateRajasthan
CategoryRenewable Energy
Sub-CategoryRenewable Energy
Specification5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw

Biomass Power Plants — 5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw

Eligibility for Biomass Power Plants Subsidy in Rajasthan

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Rajasthan
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Biomass Power Plants Subsidy in Rajasthan

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹27,95,15,000 – ₹1,95,75,00,000 as the benchmark for a 5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw investment.
  2. Visit your bank in Rajasthan — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Biomass Power Plants Subsidy — State-wise Comparison

NABARD unit costs for Biomass Power Plants across 4 states. Amounts reflect local input costs and state-level additions.

Biomass Power Plants NABARD unit cost across Indian states
StateSubsidy AmountDetails
Rajasthancurrent₹1,11,85,07,500View →
Rajasthancurrent₹97,83,00,000View →
Rajasthancurrent₹91,62,00,000View →
Rajasthancurrent₹90,06,60,000View →

More Renewable Energy Subsidies in Rajasthan

View all Renewable Energy activities in Rajasthan →

More Subsidy Categories in Rajasthan

Frequently Asked Questions

What is the NABARD subsidy amount for Biomass Power Plants in Rajasthan?

The NABARD unit cost for Biomass Power Plants in Rajasthan is ₹27,95,15,000 – ₹1,95,75,00,000 (specification: 5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw" mean for Biomass Power Plants?

The specification "5Mw to 25 Mw Water cooled other than paddy straw and P.juliflora @Rs.5.5903 Cr/ Mw" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Biomass Power Plants subsidy in Rajasthan?

Step 1: Prepare a DPR for Biomass Power Plants using the NABARD unit cost of ₹27,95,15,000 – ₹1,95,75,00,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Rajasthan with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Biomass Power Plants in Rajasthan?

Biomass Power Plants falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Rajasthan.

Which state gives the highest subsidy for Biomass Power Plants?

Rajasthan offers ₹27,95,15,000 – ₹1,95,75,00,000 for Biomass Power Plants, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Biomass Power Plants financing in Rajasthan?

NABARD-linked term loans for renewable energy investments like Biomass Power Plants typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.