Renewable Energy · Gujarat

Model III Subsidy in Gujarat

Model III

NABARD Unit Cost for Model III in Gujarat

Government-approved benchmark amount for renewable energy financing

NABARD Unit Cost₹4,84,500
StateGujarat
CategoryRenewable Energy
Sub-CategoryBore Well Submersible pumpset AC motor
Specification3000Wp PV array, Dynamic head 70m

Model III — 3000Wp PV array, Dynamic head 70m

Eligibility for Model III Subsidy in Gujarat

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Gujarat
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 3000Wp PV array, Dynamic head 70m. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Model III Subsidy in Gujarat

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹4,84,500 as the benchmark for a 3000Wp PV array, Dynamic head 70m investment.
  2. Visit your bank in Gujarat — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Model III Subsidy — State-wise Comparison

NABARD unit costs for Model III across 8 states. Amounts reflect local input costs and state-level additions.

Model III NABARD unit cost across Indian states
StateSubsidy AmountDetails
Telangana₹9,42,000View →
Gujaratcurrent₹5,70,000View →
Gujaratcurrent₹5,13,000View →
Gujaratcurrent₹4,84,500View →
Gujaratcurrent₹4,36,050View →
Uttar Pradesh₹3,82,500View →
Assam₹60,000View →
Tripura₹60,000View →

More Renewable Energy Subsidies in Gujarat

View all Renewable Energy activities in Gujarat →

More Subsidy Categories in Gujarat

Frequently Asked Questions

What is the NABARD subsidy amount for Model III in Gujarat?

The NABARD unit cost for Model III in Gujarat is ₹4,84,500 (specification: 3000Wp PV array, Dynamic head 70m). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "3000Wp PV array, Dynamic head 70m" mean for Model III?

The specification "3000Wp PV array, Dynamic head 70m" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Model III subsidy in Gujarat?

Step 1: Prepare a DPR for Model III using the NABARD unit cost of ₹4,84,500 as the benchmark. Step 2: Visit a nationalised bank or RRB in Gujarat with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Model III in Gujarat?

Model III falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Gujarat.

Which state gives the highest subsidy for Model III?

Among states with published NABARD unit costs for Model III, Telangana offers the highest amount at ₹9,42,000, compared to ₹4,84,500 in Gujarat. Differences reflect local input costs, transport, and state-level top-up subsidies. The compare table below shows amounts across all states where this activity has published unit costs.

What is the loan repayment period for Model III financing in Gujarat?

NABARD-linked term loans for renewable energy investments like Model III typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.