Minor Irrigation · Uttar Pradesh

Solar Pump Subsidy in Uttar Pradesh

Solar Pump

NABARD Unit Cost for Solar Pump in Uttar Pradesh

Government-approved benchmark amount for minor irrigation financing

NABARD Unit Cost₹2,91,900
StateUttar Pradesh
CategoryMinor Irrigation
Sub-CategoryPumpset
Specification2700 wp(3HP)

Solar Pump — 2700 wp(3HP)

Eligibility for Solar Pump Subsidy in Uttar Pradesh

Who can apply

Specification note

This unit cost applies specifically to: 2700 wp(3HP). If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Solar Pump Subsidy in Uttar Pradesh

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹2,91,900 as the benchmark for a 2700 wp(3HP) investment.
  2. Visit your bank in Uttar Pradesh — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM or PMKSY.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Solar Pump Subsidy — State-wise Comparison

NABARD unit costs for Solar Pump across 3 states. Amounts reflect local input costs and state-level additions.

Solar Pump NABARD unit cost across Indian states
StateSubsidy AmountDetails
Uttar Pradeshcurrent₹4,25,250View →
Uttar Pradeshcurrent₹2,91,900View →
Uttar Pradeshcurrent₹2,21,000View →

More Minor Irrigation Subsidies in Uttar Pradesh

View all Minor Irrigation activities in Uttar Pradesh →

More Subsidy Categories in Uttar Pradesh

Frequently Asked Questions

What is the NABARD subsidy amount for Solar Pump in Uttar Pradesh?

The NABARD unit cost for Solar Pump in Uttar Pradesh is ₹2,91,900 (specification: 2700 wp(3HP)). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "2700 wp(3HP)" mean for Solar Pump?

The specification "2700 wp(3HP)" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Solar Pump subsidy in Uttar Pradesh?

Step 1: Prepare a DPR for Solar Pump using the NABARD unit cost of ₹2,91,900 as the benchmark. Step 2: Visit a nationalised bank or RRB in Uttar Pradesh with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Minor Irrigation department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Solar Pump in Uttar Pradesh?

Solar Pump falls under the Minor Irrigation category. Relevant central schemes include PM-KUSUM (solar pumps) and PMKSY (irrigation). Check the Apply section below for the specific portal and nodal department in Uttar Pradesh.

Which state gives the highest subsidy for Solar Pump?

Uttar Pradesh offers ₹2,91,900 for Solar Pump, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Solar Pump financing in Uttar Pradesh?

NABARD-linked term loans for minor irrigation investments like Solar Pump typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.