Renewable Energy · Tripura

Biogas Subsidy in Tripura

Biogas

NABARD Unit Cost for Biogas in Tripura

Government-approved benchmark amount for renewable energy financing

NABARD Unit Cost₹36,000
StateTripura
CategoryRenewable Energy
Sub-CategoryBiogas
Specification2 CuM capacity with stove valves and fittings

Biogas — 2 CuM capacity with stove valves and fittings

Eligibility for Biogas Subsidy in Tripura

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Tripura
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 2 CuM capacity with stove valves and fittings. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Biogas Subsidy in Tripura

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹36,000 as the benchmark for a 2 CuM capacity with stove valves and fittings investment.
  2. Visit your bank in Tripura — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Biogas Subsidy — State-wise Comparison

NABARD unit costs for Biogas across 6 states. Amounts reflect local input costs and state-level additions.

Biogas NABARD unit cost across Indian states
StateSubsidy AmountDetails
Jammu and Kashmir₹60,000View →
Tripuracurrent₹46,000View →
Tripuracurrent₹36,000View →
Chhattisgarh₹35,800View →
Chhattisgarh₹29,600View →
Chhattisgarh₹25,200View →

More Renewable Energy Subsidies in Tripura

View all Renewable Energy activities in Tripura →

More Subsidy Categories in Tripura

Frequently Asked Questions

What is the NABARD subsidy amount for Biogas in Tripura?

The NABARD unit cost for Biogas in Tripura is ₹36,000 (specification: 2 CuM capacity with stove valves and fittings). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "2 CuM capacity with stove valves and fittings" mean for Biogas?

The specification "2 CuM capacity with stove valves and fittings" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Biogas subsidy in Tripura?

Step 1: Prepare a DPR for Biogas using the NABARD unit cost of ₹36,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Tripura with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Biogas in Tripura?

Biogas falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Tripura.

Which state gives the highest subsidy for Biogas?

Among states with published NABARD unit costs for Biogas, Jammu and Kashmir offers the highest amount at ₹60,000, compared to ₹36,000 in Tripura. Differences reflect local input costs, transport, and state-level top-up subsidies. The compare table below shows amounts across all states where this activity has published unit costs.

What is the loan repayment period for Biogas financing in Tripura?

NABARD-linked term loans for renewable energy investments like Biogas typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.