Minor Irrigation · Telangana

Tube well Subsidy in Telangana

Tube well

NABARD Unit Cost for Tube well in Telangana

Government-approved benchmark amount for minor irrigation financing

NABARD Unit Cost₹3,51,900
StateTelangana
CategoryMinor Irrigation
Sub-CategoryBore well
Specification180mm Diameter 150m Depth

Tube well — 180mm Diameter 150m Depth

Eligibility for Tube well Subsidy in Telangana

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Telangana
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 180mm Diameter 150m Depth. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Tube well Subsidy in Telangana

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹3,51,900 as the benchmark for a 180mm Diameter 150m Depth investment.
  2. Visit your bank in Telangana — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM or PMKSY.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

Tube well Subsidy — State-wise Comparison

NABARD unit costs for Tube well across 10 states. Amounts reflect local input costs and state-level additions.

Tube well NABARD unit cost across Indian states
StateSubsidy AmountDetails
Haryana₹6,00,000View →
Haryana₹5,50,000View →
Haryana₹5,00,000View →
Andhra Pradesh₹3,67,300View →
Telanganacurrent₹3,51,900View →
Haryana₹3,50,000View →
Haryana₹3,20,000View →
Jammu and Kashmir₹3,20,000View →
Madhya Pradesh₹1,69,700View →
Madhya Pradesh₹1,07,000View →

More Minor Irrigation Subsidies in Telangana

View all Minor Irrigation activities in Telangana →

More Subsidy Categories in Telangana

Frequently Asked Questions

What is the NABARD subsidy amount for Tube well in Telangana?

The NABARD unit cost for Tube well in Telangana is ₹3,51,900 (specification: 180mm Diameter 150m Depth). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "180mm Diameter 150m Depth" mean for Tube well?

The specification "180mm Diameter 150m Depth" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Tube well subsidy in Telangana?

Step 1: Prepare a DPR for Tube well using the NABARD unit cost of ₹3,51,900 as the benchmark. Step 2: Visit a nationalised bank or RRB in Telangana with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Minor Irrigation department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Tube well in Telangana?

Tube well falls under the Minor Irrigation category. Relevant central schemes include PM-KUSUM (solar pumps) and PMKSY (irrigation). Check the Apply section below for the specific portal and nodal department in Telangana.

Which state gives the highest subsidy for Tube well?

Among states with published NABARD unit costs for Tube well, Haryana offers the highest amount at ₹6,00,000, compared to ₹3,51,900 in Telangana. Differences reflect local input costs, transport, and state-level top-up subsidies. The compare table below shows amounts across all states where this activity has published unit costs.

What is the loan repayment period for Tube well financing in Telangana?

NABARD-linked term loans for minor irrigation investments like Tube well typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.