Minor Irrigation · Jammu And Kashmir
Solar Pumpset Subsidy in Jammu And Kashmir
Solar Pumpset
NABARD Unit Cost for Solar Pumpset in Jammu And Kashmir
Government-approved benchmark amount for minor irrigation financing
Solar Pumpset — 3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC
Eligibility for Solar Pumpset Subsidy in Jammu And Kashmir
Who can apply
- Individual farmers with land records (7/12, patta, or registered lease deed) in Jammu And Kashmir
- Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
- Agri-entrepreneurs and cooperatives for commercial-scale investments
- SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)
Specification note
This unit cost applies specifically to: 3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.
How to Apply for Solar Pumpset Subsidy in Jammu And Kashmir
Step-by-step process
- Prepare a Detailed Project Report — Use the NABARD unit cost of ₹5,70,000 as the benchmark for a 3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC investment.
- Visit your bank in Jammu And Kashmir — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
- Scheme linkage — The bank will link your application to PM KUSUM or PMKSY.
- Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
- Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.
Solar Pumpset Subsidy — State-wise Comparison
NABARD unit costs for Solar Pumpset across 4 states. Amounts reflect local input costs and state-level additions.
More Minor Irrigation Subsidies in Jammu And Kashmir
- Pumpset₹40,000
- Pumpset₹90,000
- Pumpset₹1,60,000
- Small lift points₹2,75,000
- Deep Lift Points₹4,00,000
- Bore Well₹4,00,000
- Bore Well₹6,00,000
- Bore Well₹25,00,000
More Subsidy Categories in Jammu And Kashmir
Agri Finance & Credit
Loans, crop insurance and investment norms — NABARD unit costs, PMFBY rates and KCC interest.
Weather & Crop Advisories
District-level agromet advisories combining IMD 5-day weather forecasts with crop-specific pest, disease and irrigation recommendations.
Agriculture News
Daily updates on mandi price movements, scheme announcements, weather advisories and crop-wise reports from state agriculture departments.
Agri Input Dealers
Find licensed seed, fertilizer and pesticide dealers near you.
Frequently Asked Questions
What is the NABARD subsidy amount for Solar Pumpset in Jammu and Kashmir?
The NABARD unit cost for Solar Pumpset in Jammu and Kashmir is ₹5,70,000 (specification: 3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.
What does "3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC" mean for Solar Pumpset?
The specification "3000WP 70 head 57000 Ltrs from a head of 50 AC 63000 ltr DC" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.
How do I apply for the Solar Pumpset subsidy in Jammu and Kashmir?
Step 1: Prepare a DPR for Solar Pumpset using the NABARD unit cost of ₹5,70,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Jammu and Kashmir with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Minor Irrigation department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.
Which government scheme covers Solar Pumpset in Jammu and Kashmir?
Solar Pumpset falls under the Minor Irrigation category. Relevant central schemes include PM-KUSUM (solar pumps) and PMKSY (irrigation). Check the Apply section below for the specific portal and nodal department in Jammu and Kashmir.
Which state gives the highest subsidy for Solar Pumpset?
Jammu and Kashmir offers ₹5,70,000 for Solar Pumpset, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.
What is the loan repayment period for Solar Pumpset financing in Jammu and Kashmir?
NABARD-linked term loans for minor irrigation investments like Solar Pumpset typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.