Renewable Energy · Haryana

Solar Water Heater Subsidy in Haryana

Solar Water Heater

NABARD Unit Cost for Solar Water Heater in Haryana

Government-approved benchmark amount for renewable energy financing

NABARD Unit Cost₹20,000
StateHaryana
CategoryRenewable Energy
Sub-CategorySolar Water Heater
Specification100 Lpd

Solar Water Heater — 100 Lpd

Eligibility for Solar Water Heater Subsidy in Haryana

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Haryana
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 100 Lpd. If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Solar Water Heater Subsidy in Haryana

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹20,000 as the benchmark for a 100 Lpd investment.
  2. Visit your bank in Haryana — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PM KUSUM.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

More Renewable Energy Subsidies in Haryana

View all Renewable Energy activities in Haryana →

More Subsidy Categories in Haryana

Frequently Asked Questions

What is the NABARD subsidy amount for Solar Water Heater in Haryana?

The NABARD unit cost for Solar Water Heater in Haryana is ₹20,000 (specification: 100 Lpd). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "100 Lpd" mean for Solar Water Heater?

The specification "100 Lpd" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Solar Water Heater subsidy in Haryana?

Step 1: Prepare a DPR for Solar Water Heater using the NABARD unit cost of ₹20,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Haryana with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Renewable Energy department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Solar Water Heater in Haryana?

Solar Water Heater falls under the Renewable Energy category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Haryana.

Which state gives the highest subsidy for Solar Water Heater?

Haryana offers ₹20,000 for Solar Water Heater, which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Solar Water Heater financing in Haryana?

NABARD-linked term loans for renewable energy investments like Solar Water Heater typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.