Land Development · Sikkim

Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) Subsidy in Sikkim

Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC)

NABARD Unit Cost for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) in Sikkim

Government-approved benchmark amount for land development financing

NABARD Unit Cost₹1,00,000
StateSikkim
CategoryLand Development
Sub-CategoryLand Development
Specification20 Cubic Centre Caoacity(RCC)

Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) — 20 Cubic Centre Caoacity(RCC)

Eligibility for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) Subsidy in Sikkim

Who can apply

  • Individual farmers with land records (7/12, patta, or registered lease deed) in Sikkim
  • Farmer Producer Organisations (FPOs) and Self-Help Groups (SHGs)
  • Agri-entrepreneurs and cooperatives for commercial-scale investments
  • SC/ST farmers and women farmers (eligible for enhanced subsidy component of 5–10% additional)

Specification note

This unit cost applies specifically to: 20 Cubic Centre Caoacity(RCC). If your investment differs in scale or configuration, ask your bank to identify the nearest applicable NABARD benchmark.

How to Apply for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) Subsidy in Sikkim

Step-by-step process

  1. Prepare a Detailed Project Report — Use the NABARD unit cost of ₹1,00,000 as the benchmark for a 20 Cubic Centre Caoacity(RCC) investment.
  2. Visit your bank in Sikkim — Bring Aadhaar, land records (7/12 or patta), and the DPR to a nationalised bank, RRB, or PACS branch.
  3. Scheme linkage — The bank will link your application to PMKSY.
  4. Technical verification — A department officer inspects the asset after installation and submits a verification report to the sanctioning authority.
  5. Subsidy credit to loan account — The capital subsidy is deposited directly into your loan account, reducing the outstanding principal. Total processing time: 30–60 days.

Relevant central schemes:

More Land Development Subsidies in Sikkim

View all Land Development activities in Sikkim →

More Subsidy Categories in Sikkim

Frequently Asked Questions

What is the NABARD subsidy amount for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) in Sikkim?

The NABARD unit cost for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) in Sikkim is ₹1,00,000 (specification: 20 Cubic Centre Caoacity(RCC)). This is the benchmark amount banks use when sanctioning a term loan for this activity. The actual subsidy you receive depends on the scheme — typically 25–50% of the unit cost.

What does "20 Cubic Centre Caoacity(RCC)" mean for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC)?

The specification "20 Cubic Centre Caoacity(RCC)" defines the exact scale or parameters of the investment — such as area in hectares, capacity in litres per day, number of animals, or structural dimensions. NABARD unit costs are tied to this specification; a different scale may have a different unit cost. If your project differs, ask your bank to use the nearest applicable NABARD benchmark.

How do I apply for the Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) subsidy in Sikkim?

Step 1: Prepare a DPR for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) using the NABARD unit cost of ₹1,00,000 as the benchmark. Step 2: Visit a nationalised bank or RRB in Sikkim with land records, Aadhaar, and the DPR. Step 3: The bank appraises and routes the subsidy claim through the Land Development department. Step 4: After physical verification, the subsidy is deposited into your loan account. Total processing time is typically 30–60 days.

Which government scheme covers Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) in Sikkim?

Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) falls under the Land Development category. Relevant central schemes include various NABARD-refinanced schemes. Check the Apply section below for the specific portal and nodal department in Sikkim.

Which state gives the highest subsidy for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC)?

Sikkim offers ₹1,00,000 for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC), which is among the higher rates across Indian states. The compare table below shows the exact amount in each state where NABARD has published a unit cost for this activity.

What is the loan repayment period for Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) financing in Sikkim?

NABARD-linked term loans for land development investments like Rain Harvesting Structures 20 Cubic Centre Caoacity(RCC) typically have a repayment period of 5–9 years (including a moratorium of 1–2 years). The moratorium aligns with the gestation period of the investment — for example, a fruit orchard may take 3 years to yield income, so repayment begins after that. Exact tenure depends on your bank and the specific scheme.