Water Resources - NABARD Unit Costs for Tamil Nadu 2026-27

55 activities · Tamil Nadu · 2026-27

Water Resources Unit Costs in Tamil Nadu (2026-27)

NABARD unit costs for Water Resources in Tamil Nadu 2026-27
ActivityUnitUnit Cost (₹)Max Bank Loan (₹)Subsidy Scheme
Dug well in Hard stiff clay, gravel, stoney earth etc.per unit₹6,85,000₹5,99,375
Dug well in Hard stiff clay, gravel, stoney earth etc.per unit₹8,20,000₹7,17,500
Dug well in Hard stiff clay, gravel, stoney earth etc.per unit₹7,50,000₹6,56,250
Borewell in hard rockper unit₹1,19,000₹1,04,125
Tube well in Alluvium formationsper unit₹5,95,000₹5,20,625
1.5 HPper unit₹19,249₹16,843
25.5 HPper unit₹73,600₹64,400
30 HPper unit₹1,08,823₹95,220
12.5 HPper unit₹56,251₹49,220
15 HPper unit₹60,608₹53,032
NABARD unit costs for Water Resources in Tamil Nadu 2026-27 (continued)
ActivityUnitUnit Cost (₹)Max Bank Loan (₹)Subsidy Scheme
7.5 HPper unit₹2,19,000₹1,91,625
Mango/Chiku/Tamarindper unit₹60,000₹52,500NHM40–50%
Coconutper unit₹75,000₹65,625NHM40–50%
Guava, Lemon, Orange, Mosambi, Cashewper unit₹75,000₹65,625NHM40–50%
Papaya, Arecanut, Custard Apple, Pome- granate, Drumstickper unit₹90,000₹78,750NHM40–50%
Grapeper unit₹90,000₹78,750
Bananaper unit₹90,000₹78,750NHM40–50%
Sugarcaneper unit₹1,20,000₹1,05,000
5 HP AC (4800 Wp)per unit₹3,00,564₹2,62,994
5 HP DC (4800 Wp)per unit₹3,00,564₹2,62,994
7.5 HP AC (6750 Wp)per unit₹4,23,077₹3,70,192
7.5 HP DC (6750 Wp)per unit₹4,23,077₹3,70,192
10 HP AC (9000 Wp)per unit₹5,18,038₹4,53,283
10 HP DC (9000 Wp)per unit₹5,18,038₹4,53,283
12.5 HP AC (11250 Wp)per unit₹6,50,678₹5,69,343
12.5 HP DC (11250 Wp)per unit₹6,50,678₹5,69,343
15HP AC (13500 Wp)per unit₹7,83,862₹6,85,879
15HP DC (13500 Wp)per unit₹7,83,862₹6,85,879
3 HP AC (2700 Wp)per unit₹2,06,257₹1,80,475
3 HP DC (2700 Wp)per unit₹2,06,257₹1,80,475
5 HP AC (4800 Wp)per unit₹2,98,931₹2,61,565
5 HP DC (4800 Wp)per unit₹2,98,931₹2,61,565
7.5 HP AC (6750 Wp)per unit₹4,20,246₹3,67,715
7.5 HP DC (6750 Wp)per unit₹4,20,246₹3,67,715
Electricity & waterper unit₹10,000₹8,750
Electricity & waterper unit₹13,500₹11,813
Cost of shed including feeder & waterer - Con- ventional shed - mud floor with pen and run area - Adultper unit₹3,77,700₹3,30,488
Cost of shed including feeder & waterer - Con- ventional shed - mud floor with pen and run area - young onesper unit₹4,64,400₹4,06,350
Cost of shed including feeder & waterer - Hi tech - slatted floor - Adultper unit₹7,55,400₹6,60,975
Cost of shed including feeder & waterer - Hi tech - slatted floor - young onesper unit₹9,28,800₹8,12,700
Cost of equipment (feeder & waterer)per unit₹40,000₹35,000
Waterer costper unit₹19,500₹17,063
Electricity & waterper unit₹30,000₹26,250
Cost of equipment (Feeder, waterer, brooder) at approx. ₹10/birdper unit₹5,000₹4,375
Electricity & waterper unit₹5,000₹4,375
Installation of drip irrigation systemper unit₹65,000₹56,875PMKSY45–55%
Irrigation and general maintenanceper unit₹90,000₹78,750
Irrigation and maintenanceper unit₹1,35,000₹1,18,125
Water Pumps 7.5 HPper unit₹40,000₹35,000
Repairing and renovation of electrical and water supplyper unit₹20,000₹17,500
Water supply itemsper unit₹25,000₹21,875
Water treatment equipmentper unit₹10,000₹8,750
Setup of Tarpaulin/Fibre tanks (15,000 Litres capacity, 7 No’s, 4 metre diameter, 1.5 meter height,1.20 m water depth)per unit₹1,82,000₹1,59,250
Water supply borewell(3HP)per unit₹1,00,000₹87,500
PVC pipe fittings for air, water flowper unit₹75,000₹65,625

Source: NABARD Statewise Master Unit Cost Portal (nabard.org) - 2026-27 booklet · View source →. Updated: reviewed annually; updated within 48 hours of NABARD publishing revised figures · last on · Report an error

Frequently Asked Questions

What are the NABARD unit costs for Water Resources in Tamil Nadu?

NABARD's indicative unit costs for Water Resources activities in Tamil Nadu (2026-27) cover 55 activities. These are used by banks to sanction term loans for agricultural investments under priority sector lending guidelines.

How much loan can I get for Water Resources activities in Tamil Nadu?

Banks typically sanction 87.5% of the NABARD unit cost as the maximum bank loan. For Water Resources activities in Tamil Nadu, this means the Max Bank Loan shown in this table. The actual sanction depends on your bank's credit assessment, land holding, and repayment capacity.

Are there government subsidies available for Water Resources in Tamil Nadu?

Several central and state government schemes offer subsidies on Water Resources activities. The Subsidy Scheme column in the table above shows applicable schemes for each activity. Subsidy amounts are calculated as a percentage of the NABARD unit cost and are credited directly to your loan account.

How does NABARD calculate unit costs for Water Resources?

NABARD determines unit costs for Water Resources by surveying actual input costs, material prices, and labour rates across Tamil Nadu districts. These are updated annually at the start of each financial year. The current figures are for 2026-27.

Which banks use NABARD unit costs for Water Resources loans in Tamil Nadu?

All nationalised banks, Regional Rural Banks (RRBs), cooperative banks, and NABARD-refinanced institutions in Tamil Nadu use NABARD unit costs for Water Resources activities as the basis for sanctioning Kisan Credit Card (KCC), Agricultural Term Loans (ATL), and priority sector agriculture loans.

Other Categories in Tamil Nadu

← Tamil Nadu NABARD Overview

Disclaimer: Unit costs are indicative figures published by NABARD and may not reflect current market prices or your bank's internal norms. Loan sanction amounts are determined by individual banks subject to their credit policy, land holding, and repayment capacity assessment. NaPanta (FarmGreen Agritech India Private Limited) is not a lender and does not process loan applications.