NABARD unit costs for Land Development in Maharashtra 2026-27
ActivityUnitUnit Cost (₹)Max Bank Loan (₹)Subsidy Scheme
Field drainage for wetlandsper unit₹32,560₹28,490
Water Harvesting Structures for C o m m u n i t y – Construction of on farm community tank, pond /reser voirs with use of plastic/RCC liningper unit₹8,00,000₹7,00,000
Pipe and pipe fittingsper unit₹74,618₹65,291
Excavation, pipe laying and road crossingsper unit₹35,668₹31,210
Outletsper unit₹10,706₹9,368
Survey and Supervision charges (10% of A)per unit₹12,472₹10,913
Contingencies (5% of B)per unit₹6,860₹6,003
Excavation, pipe layingper unit₹35,000₹30,625
Survey and Supervision chargesper unit₹12,500₹10,938
Levelling and earth filling for vermicompost shedsper unit₹5,900₹5,163
NABARD unit costs for Land Development in Maharashtra 2026-27 (continued)
ActivityUnitUnit Cost (₹)Max Bank Loan (₹)Subsidy Scheme
Fencing and gateper unit₹10,500₹9,188
Open Shed with brick lined bed bottom & platform with RCC / MS pipe post & truss and thatch /HDPE /l ocally available roof (@ 1000/m2) for: Vermicom- per unit₹35,000₹30,625
Discounted Costsper unit₹51,435₹45,006
Discounted Incomeper unit₹14,394₹12,595
Open Shed with brick lined bed bottom & platform with RCC / MS pipe post & truss and thatch /HDPE / locally available roof (@ 1000/ m2) for: Vermicompper unit₹20,000₹17,500

Source: NABARD Statewise Master Unit Cost Portal (nabard.org) - 2026-27 booklet · View source →. Updated: reviewed annually; updated within 48 hours of NABARD publishing revised figures · last on · Report an error

Frequently Asked Questions

What are the NABARD unit costs for Land Development in Maharashtra?

NABARD's indicative unit costs for Land Development activities in Maharashtra (2026-27) cover 15 activities. These are used by banks to sanction term loans for agricultural investments under priority sector lending guidelines.

How much loan can I get for Land Development activities in Maharashtra?

Banks typically sanction 87.5% of the NABARD unit cost as the maximum bank loan. For Land Development activities in Maharashtra, this means the Max Bank Loan shown in this table. The actual sanction depends on your bank's credit assessment, land holding, and repayment capacity.

Are there government subsidies available for Land Development in Maharashtra?

Several central and state government schemes offer subsidies on Land Development activities. The Subsidy Scheme column in the table above shows applicable schemes for each activity. Subsidy amounts are calculated as a percentage of the NABARD unit cost and are credited directly to your loan account.

How does NABARD calculate unit costs for Land Development?

NABARD determines unit costs for Land Development by surveying actual input costs, material prices, and labour rates across Maharashtra districts. These are updated annually at the start of each financial year. The current figures are for 2026-27.

Which banks use NABARD unit costs for Land Development loans in Maharashtra?

All nationalised banks, Regional Rural Banks (RRBs), cooperative banks, and NABARD-refinanced institutions in Maharashtra use NABARD unit costs for Land Development activities as the basis for sanctioning Kisan Credit Card (KCC), Agricultural Term Loans (ATL), and priority sector agriculture loans.

Other Categories in Maharashtra

← Maharashtra NABARD Overview

Disclaimer: Unit costs are indicative figures published by NABARD and may not reflect current market prices or your bank's internal norms. Loan sanction amounts are determined by individual banks subject to their credit policy, land holding, and repayment capacity assessment. NaPanta (FarmGreen Agritech India Private Limited) is not a lender and does not process loan applications.